This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 258723 - Subtask status incorrect
Summary: Subtask status incorrect
Status: RESOLVED FIXED
Alias: None
Product: connecteddeveloper
Classification: Unclassified
Component: Jira (show other bugs)
Version: 8.1
Hardware: PC Windows 7
: P3 normal (vote)
Assignee: Tomas Stupka
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2016-04-08 09:45 UTC by RaySlater
Modified: 2016-04-13 01:47 UTC (History)
0 users

See Also:
Issue Type: DEFECT
Exception Reporter:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description RaySlater 2016-04-08 09:45:20 UTC
When a JIRA has sub-tasks, the Subtasks section of the JIRA is populated with a summary of those sub-tasks. There is a status field which one assumes is supposed to show the status of each sub-task (ie open, resolved, closed, etc) but instead this status field shows what I guess is the internal netbeans status as to whether the JIRA has been changed since it was last viewed, ie the status is either "SEEN" or "INCOMING_MODIFIED".
Comment 1 Tomas Stupka 2016-04-12 13:44:04 UTC
indeed
Comment 2 Tomas Stupka 2016-04-12 14:55:56 UTC
fixed in jet-main #f0b169fe924c
Comment 3 Quality Engineering 2016-04-13 01:47:56 UTC
Integrated into 'main-silver', will be available in build *201604130001* on http://bits.netbeans.org/dev/nightly/ (upload may still be in progress)

Changeset: http://hg.netbeans.org/main-silver/rev/f0b169fe924c
User: Tomas Stupka <tstupka@netbeans.org>
Log: Issue #258723 - Subtask status incorrect