This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 114085 - incorrect icon used in project tree for sequence diagram reference
Summary: incorrect icon used in project tree for sequence diagram reference
Status: RESOLVED INVALID
Alias: None
Product: uml
Classification: Unclassified
Component: Diagram Sequence (show other bugs)
Version: 6.x
Hardware: All All
: P3 blocker (vote)
Assignee: issues@uml
URL:
Keywords: REGRESSION
Depends on:
Blocks:
 
Reported: 2007-08-29 08:45 UTC by Peter Lam
Modified: 2007-08-29 18:54 UTC (History)
0 users

See Also:
Issue Type: DEFECT
Exception Reporter:


Attachments
sequence diagram (34.96 KB, image/png)
2007-08-29 08:45 UTC, Peter Lam
Details

Note You need to log in before you can comment on or make changes to this bug.
Description Peter Lam 2007-08-29 08:45:01 UTC
in build 070828

When dragging a sequence diagram interaction node into another sequence diagram, a sequence diagram reference is created
and currently displayed using a plain document icon. See attached screenshot.

Repro steps:
- create a uml project
- create 2 sequence diagrams name sqd1 & sqd2
- drag the interaction node of sqd1 to sqd2 diagram
- expand the interaction node of sqd2
Comment 1 Peter Lam 2007-08-29 08:45:23 UTC
Created attachment 47684 [details]
sequence diagram
Comment 2 Craig Conover 2007-08-29 18:54:19 UTC
I believe the problem is that the second seq diagram node should not be allowed inside the interaction node. It should
have prevented the DnD. Only one sequence and one collaboration diagram per interaction node, as far as I know.

If I am correct, then this issue should be closed as invalid and another issue opened under the project subcategory.