Summary: | It's impossible to resize/split execution specification area for messages (blue square) | ||
---|---|---|---|
Product: | uml | Reporter: | Sergey Petrov <sj-nb> |
Component: | Diagram Sequence | Assignee: | issues@uml <issues> |
Status: | RESOLVED WONTFIX | ||
Severity: | blocker | ||
Priority: | P2 | ||
Version: | 5.x | ||
Hardware: | All | ||
OS: | All | ||
Issue Type: | DEFECT | Exception Reporter: | |
Bug Depends on: | 131972 | ||
Bug Blocks: |
Description
Sergey Petrov
2006-12-20 12:39:19 UTC
Apart from the mentioned, there is also a regression if the async message is contained within the sync message, and the sync message is moved to not contain the async message. This needs to be fixed. - The problem stated in 5b no longer exists as a result of the fix for issue 78491. - Since 5b was fixed, there's no need to resize (vertically) the blue bar as mentioned in 5c. - The problem in 5d still exists. - The regression issue mentioned by jyothivasa can not be reproduced with the latest daily build Planned for drawing area upgrade after NB 6.0. Should not use resolved/later status. Targeted in the drawing area redesign. REstoring the original priority and using the NB 6.0 waiver process. *** Issue 116434 has been marked as a duplicate of this issue. *** Diagram area bugs waived for 6.0 will also be waived for 6.1. it's not necessary now but the issue is dependent on issue 131972 Removing obsolete assignments. Bugs will be reassigned for M2. in 6.5 execution specifications are not stick to each other |