This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.

Bug 257801 - Commit events not shown in activities of project dashboard
Summary: Commit events not shown in activities of project dashboard
Status: VERIFIED FIXED
Alias: None
Product: connecteddeveloper
Classification: Unclassified
Component: ODCS (show other bugs)
Version: 8.1
Hardware: All All
: P3 normal (vote)
Assignee: Tomas Stupka
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2016-02-01 14:32 UTC by Tomas Stupka
Modified: 2016-02-05 17:26 UTC (History)
2 users (show)

See Also:
Issue Type: DEFECT
Exception Reporter:


Attachments

Note You need to log in before you can comment on or make changes to this bug.
Description Tomas Stupka 2016-02-01 14:32:00 UTC
Product Version = NetBeans IDE 8.1 RC (Build 201510012201)
Operating System = Mac OS X version 10.11.2 running on x86_64
Java; VM; Vendor = 1.8.0_60-ea
Runtime = Java HotSpot(TM) 64-Bit Server VM 25.60-b07

Reproducibility: Happens every time

STEPS:
  open some odcs projects dashboard

ACTUAL:
  commit (push) events are missing in the Recent Activities list on the project dashboard.
Comment 1 Tomas Stupka 2016-02-02 09:25:46 UTC
fixed in jet-main #769f2a547026
Comment 2 Quality Engineering 2016-02-03 02:39:01 UTC
Integrated into 'main-silver', will be available in build *201602030002* on http://bits.netbeans.org/dev/nightly/ (upload may still be in progress)

Changeset: http://hg.netbeans.org/main-silver/rev/769f2a547026
User: Tomas Stupka <tstupka@netbeans.org>
Log: Issue #257801 - Commit events not shown in activities of project dashboard
Comment 3 Tomas Pavek 2016-02-05 17:26:39 UTC
Verified in "Build ODCS-899-on-20160205".