This Bugzilla instance is a read-only archive of historic NetBeans bug reports. To report a bug in NetBeans please follow the project's instructions for reporting issues.
Product Version = NetBeans IDE 6.9 (Build 201006101454) Operating System = Windows 7 version 6.1 running on x86 Java; VM; Vendor = 1.6.0_20 Runtime = Java HotSpot(TM) Client VM 16.3-b01 All dates in the JIRA integration are shown as year-monthname-date (for example 2010-jun-19). When trying to log work to a case I get the error "You did not enter a valid date. Please enter the date in the format "yyyy-MM-dd", eg. "2010-06-19"". When I try to change the date in the field to log work it is automatically changed back to the monthname when I leave the field.
Update: changing the Windows 7 Regional Settings to English makes it possible to log work. Changing the Regional Settings to Swedish and the operation fails. The Swedish short date string is yyyy-MM-dd.